|
|
|
Made Proudly in USA of Mil-Spec Components
|
STEALTH BAZOOKA SB-10
INSTALLATION
INSTRUCTIONS Click
here to return to Stealth Bazooka WARNING:
DO NOT INSTALL THE STEALTH BAZOOKA WHERE ANY PART OF THE FLAGPOLE CAN
COME INTO CONTACT WITH OVERHEAD POWER LINES DURING INSTALLATION OR IN THE COURSE
OF NORMAL FLEXING AFTER INSTALLATION FOR SUCH CONTACT CAN RESULT IN DAMAGE TO
PROPERTY, BODILY INJURY OR EVEN DEATH.
NOTE: PLEASE
CONSULT THE A.R.R.L HANDBOOK FOR ADDITIONAL SAFETY PROCEDURES WHEN WORKING WITH
ANTENNAS AND ASSOCIATED ELECTRICAL EQUIPMENT.
NOTE:
IT IS RECOMMENDED TO READ ALL INSTRUCTIONS THOROUGHLY BEFORE
PROCEEDING TO ASSEMBLY. NOTE:
FIRST SURVEY YOUR LOCATION TO SELECT THE BEST
SITE FOR THE STEALTH BAZOOKA FLAGPOLE ANTENNA. IT IS RECOMMENDED THAT YOU SELECT A LOCATION AWAY
FROM OBJECTS WHERE PERFORMANCE MAY BE DEGRADED SUCH AS A HOUSE WITH ALUMINUM
SIDING OR METAL FENCE. TAKE INTO CONSIDERATION THAT THE STEALTH BAZOOKA
ANTENNA WILL REQUIRE A GROUND RADIAL SYSTEM EXTENDING OUT FROM THE ANTENNA 16
FEET IN ALL DIRECTIONS.
REQUIRED
TOOLS Flat blade screwdriver, Phillips blade screwdriver and
pliers. A 3/8 inch and 7/16 inch
open-end wrench or nut driver. PARTS LIST
Description Qty Lower Base Factory Assembled (includes) Antenna Element Assembly 1 Tube PVC 5 Ft 2.000 ID 1 Tube Aluminum 3 Ft Base Assy. 1
Middle and Top Assembly (includes) Tube PVC 6 Ft 2.000 ID 2 Tube Aluminum 1 Ft Coupling Assy. 2 Gold Ball Assembly 1 Eye Bolt with ¼ inch Locking Nuts 1 Cleat (Pre-assembled) 1
Misc. Hardware and Assemblies Tube PVC 4 Ft 2.000 ID Gnd. Section 1 Ground Radial System 1 # 8-32 X 1.250 Screw (Pre-assembled) 3 # 10-32 X 3.000 Screw 3 # 10-32 X 3/8 Screw 18 # 10-32 Hex Nut (Teflon insert) 2 # 10 Flat Washer 4 # 10 Plastic Screw Cover Washers 18 White Plastic Screw Covers Cap 18 US Flag 1 Rope 30 Ft 1 Rope Clips 2 Click
here to return to Stealth Bazooka UNPACKING ·
CAREFULLY
REMOVE THE THREE (3) PLASTIC WRAPPING MATERIAL
BANDS AROUND THE FOUR (4) PVC PIPES. NOTE:
DO NOT ATTEMPT TO PULL WIRE RADIATING ELEMENT RUNNING BETWEEN THE TWO
(2) PVC PIPES. ·
THE RADIATING ELEMENT IS LOOSELY FED THROUGH THE SIX (6) FOOT
MIDDLE PVC SECTION AND
THROUGH THE SIX (6) FOOT TOP PVC SECTION DURING SHIPMENT. FLAGPOLE ASSEMBLY
1. Check to be sure that all parts are present. Some parts may be pre assembled at the factory.
NOTE: NEVER USE EXCESSIVE FORCE OR OVER TIGHTEN # 10-32 X 3/8 INCH SCREWS.
2. Ensure the antenna element located at the top of the five (5) foot PVC base assembly is fed through the middle 6 foot PVC tube and coupler assembly. The middle coupler is the one with the rope cleat attached.
NOTE: The rope cleat should be toward the bottom of the middle PVC section for this step.
3. Insert the middle 6 foot PVC section with the coupler end into the top of base PVC section.
4. Ensure the remaining antenna element is fed into the top six (6) foot PVC section. The coupler end must be toward the middle PVC tube for this step.
NOTE: Ensure tie wrap is not folded back over spring but straight forward while inserting antenna element.
5. Install eye hook into the single ¼ inch hole located 1 inch from the top end of the PVC tube and secure with two (2) ¼ inch hex huts. Tighten securely.
6. Insert the top 6 foot PVC section with the coupler end into the middle PVC section. Ensure eye hook is located on the same side of the flagpole as the cleat.
7. Using tie wrap pull tension spring toward end of tube and slip the loop at end of spring over the ¼ inch eye hook bolt. Push excess tie wrap into PVC tube.
8. Align tapped mounting holes located at top of base tube and insert eight (8) # 10-32 X 3/8 inch screws with # 10 Plastic Cover Washers. “DO NOT OVER TIGHTEN SCREWS” Install white plastic caps over the screw heads.
9. Align the tapped holes and insert the eight (8) 10-32 X 3/8 inch screws with #10 Plastic Cover Washers into upper end of the middle six (6) foot PVC tube and tighten. “DO NOT OVER TIGHTEN SCREWS” Install white plastic caps over the screw heads.
10. Insert the Gold Ball assembly to the top end of the 6 foot PVC top section.
11. Align the mounting holes and insert two (2) # 10-32 X 3/8 inch screws with # 10 Plastic Screw Cover Washers. (See figure 2)
NOTE: DO NOT OVER TIGHTEN SCREWS INTO THE PVC TUBE.
12. Install White Plastic Screw Cover Caps to the Plastic Screw Cover Washers.
13. Align the mounting hole located in the middle of the five (5) foot PVC base tube and insert a # 10-32 X 3.000 inch screw with a # 10 Plastic Screw Cover Washer so that it come out of the opposite side of the PVC tube. (See figure 1)
14. Install flat washer and # 10-32 Hex Nut with Teflon insert to the # 10-32 X 3.000 inch screw protruding through the opposite side of the PVC tube and tighten securely. (See figure 1)
15. Install a # 10-32 X 3.000 inch GROUND SCREW at the bottom of the PVC Base Tube Assembly. Insert the screw through the PVC tube from the side away from the coax input. The PVC hole has been enlarged to recess the screw head thus allowing it to make contact with the metal base pipe. (See figure 1) Do not install a # 10 Plastic Cover Washer over Ground Screw head.
16. Install a # 10-32 Hex Nut to the # 10-32 X 3.000 inch screw protruding through the opposite side of the PVC tube directly below the coax input connector and tighten securely. Install two (2) flat washers and another #10-32 hex nut. (See figure 1) DO NOT TIGHTEN SECOND HEX NUT AT THIS TIME.
17. Open rope package and lay straight on ground. Attach plastic Flag clip as shown below. Measure space between brass grommets on flag and space second plastic clip to this measurement. Feed rope through top eye hook and tie ends together. Click
here to return to Stealth Bazooka MOUNTING /
SETTING TUBE INSTALLATION 1.
Prepare a hole in the ground 12 inches in diameter and 47 inches deep. 2.
Place the four (4) foot PVC Ground Setting Tube into the
hole allowing approximately 1 to 2 inches to extend above ground level. NOTE: ENSURE FLAG POLE BASE ASSEMBLY MOUNTING HOLE IS SLIGHTLY
ABOVE GROUND LEVEL 3.
Fill the bottom of hole with 4 inches of loose gravel. 4.
Next fill the hole with 12 inches of sand.
5. Using a level ensure
the 4 foot PVC Setting Section is perfectly level
(Straight Vertically). 6. Plumb Setting tube and brace so that it will not move during the pouring of the concrete. 7.
Fill the hole half way with concrete.
NOTE:
Recheck
the tube level. Make adjustments as required.
8.
Fill the remaining portion of the hole with concrete to within 2 inches
of ground level. See Installation Detail figure below.
9.
Again recheck the level of the mounting tube. Make any final adjustments
at this time. NOTE:
BE
SURE THE GROUND SETTING TUBE IS PERFECTLY LEVEL (STRAIGHT VERTICAL) AT THIS
TIME. FAILURE
TO ENSURE A LEVEL MOUNTING TUBE WILL RESULT IN THE FLAGPOLE NOT BEING STRAIGHT. 10.
Once concrete has hardened (approx. 48 hours) fill hole with
top soil. DO NOT INSTALL FLAG POLE BEFORE 48
HOURS.
Click here
to return to Stealth Bazooka
FLAGPOLE MOUNTING 1.
Install a 6 foot ground rod as close to the mounting tube as
possible. 2.
Drive the ground rod into the ground using a heavy metal
hammer so that only 1 to 2 inches extends above the ground level.
3.
Place Flag Pole into ground mounting tube.
Insert # 10-32 X 3.000 inch screw with # 10 Plastic Screw Cover Washer
through the top end of the mounting tube. 4.
Install flat washer and # 10-32 Hex Nut with Teflon insert
to the # 10-32 X 3.000 inch screw protruding through the opposite side of the
PVC mounting tube and tighten securely. 5.
Connect the ground radial assembly to the # 10-32 antenna
GROUND SCREW located directly below the coax feed point connector.
(See figure 1) Note:
Refer to
Ground Radial Section for proper placement.
6.
Connect a ground wire (# 10 gauge or larger) to the ground rod. 7.
Connect the
other end of the ground wire coming from the ground rod to the antenna GROUND
SCREW. (See figure 1) 8.
Secure both the ground rod wire and the ground radial assembly to the
GROUND SCREW with
#10-32 hex nuts. NOTE: A good ground connection is extremely important to achieve
low VSWR and proper antenna performance. 9.
Connect a 50 ohm coax feed line (RG-58, RG-8 or RG-213) to the recessed
SO-239 connector located at the base of the flag pole.
NOTE:
The coax connector must be tight to ensure proper antenna performance
and low VSWR.
Click here
to return to Stealth Bazooka CHECKOUT AND ADJUSTMENT 1.
The STEALTH BAZOOKA is
pre-tuned from the factory and should produce
relatively low VSRW readings over the entire 17 and 20 meter bands and
950 kHz of the 10 meter band.
2.
For
measurement checks a simple VSWR indicator may be used with a minimum of power
for accurate readings.
An
analyzer may also be used for this test.
NO
MORE THAN 10 WATTS IS RECOMMENDED TO CHECK THE VSWR.
NOTE:
Factory settings should produce resonance at 18.1 and 28.3 MHz.. However
different ground conditions and antenna location can result in higher VSWR
readings or a possible shift of the resonant frequency. GROUND
RADIAL PLACEMENT 1.
Ensure GROUND RADIAL KIT is connected and tightened securely to the
ground terminal of the base tube assembly.
2.
Fan out radials as shown in figure 9. NOTE:
Do not leave radial wires on the ground. It is recommended to bury the wires to prevent damage to the
radial kit from pedestrians and lawnmowers. 4.
Split the earth 1 to 3 inches with a square shovel or
similar tool to provide a straight line along the path of each radial wire. 5.
Press
ALL radial wires into the split earth being careful not
to cut or damage the wire. 6.
Always keep radials in a straight line.
Do not bend. NOTE: ADDITIONAL RADIALS KITS CAN BE ADDED IF GROUND CONDUCTIVITY IS POOR.
This is only a representative layout of the ground radials. Variations of figure 9 will still provide good performance.
|